Year 2008

  Number of Meetings 
Reactor Safety Commission (RSK) 
   
RSK Committees   
Plant- and Systems-Engineering  
Pressure-Retaining Components and Materials  
Electric Installations 
Reactor Operation 
Supply and Waste Handling 
   
RSK Working Groups (incl. Ad hoc WG)   
Operation Reports  
KTA 1201 and 1202 
Common Cause Failure 
Man-Technology-Organisation  
Accident Management 
Structural Engineering 
Sump Experiments 
Audio 
Hydrogen 
   
International Co-operation   
Quadripartite Workshop  1 (2 days) 
Workshop Digital Instrumentation and Control  1 (2 days) 

Year 2007

  Number of Meetings 
Reactor Safety Commission (RSK) 
   
RSK Committees   
Plant- and Systems-Engineering 
Pressure-Retaining Components and Materials  10 
Electric Installations 
Reactor Operation 
Supply and Waste Handling 
   
RSK Working Groups (incl. Ad hoc WG)   
Operation Reports 
Nuclear Regulations  18 
Generic Issues (KKK) 
Man-Technology-Organisation  
Safety Requirements for the final Disposal   12 
Safety Instrumentation and Control 
Sump Experiments 
The Karlsruhe Vitrification Plant 
Hydrogen 
Decommissioning Obrigheim  
   
International Co-operation   
Bilateral Meetings with
French Groupe Permanent Déchets (GPD)  
1 (2 days) 
Meeting with Swiss KSA  1 (2 days) 
Quadripartite Workshop "Sump Screen Clogging"  1 (2 days) 

2006

  Number of Meetings 
Reactor Safety Commission (RSK) 
   
RSK Committees   
Plant- and Systems-Engineering 
Pressure-Retaining Components and Materials 
Electric Installations 
Reactor Operation 
Supply and Waste Handling 
   
RSK Working Groups (incl. Ad hoc WG)   
Reactor Physics  
Repository-specific Issues  
Rules and Regulations  
Man-Technology-Organisation  
Operation Reports 
Storage Facility Obrigheim 
   
Bilateral Meetings with
French Groupe Permanent Déchets (GPD)  
Quadrilateral Meetings with
Groupe Permanent Réacteurs (France),
Nuclear Safety Commission (Japan),
Advisory Committee on Nuclear Safeguards (USA)  
1 (3 days) 

2005

  Number of Meetings 
Reactor Safety Commission (RSK)  11 (13 days
)  
   
RSK Committees   
Plant- and Systems-Engineering 
Pressure-Retaining Components and Materials  11 (12 days)  
Electric Installations 
Reactor Operation 
Supply and Waste Handling  7 (8 days)  
   
RSK Working Groups (incl. Ad hoc WG)   
Update of RSK Guidelines
- decommissioning 

3  
ATWS 
Module 2  
Module 7  
Reactor Physics  
Levels of Defence-in-Depth  
Specification on Wastes (Disposal)  
   
Bilateral Meetings with
French Groupe Permanent Déchets (GPD)
Swiss Commission for the Safety of Nuclear Installations (KSA)  

1 (2 days)
1 (2 days)