• Summary Report of the 522nd RSK Meeting

    The RSK was informed about the consultations on reportable event ME 17/037 “Indications during eddy current testing of steam generator heating tubes” in GKN II and reportable event ME 20/002 (F) “Annual licenced value for the discharge of the nuclide C-14 exceeded” at the FRM-II research reactor in the RSK Committee on REACTOR OPERATION (RB). The RSK's summary statement on man-made hazards, aircraft crash, was discussed. The consultations will be continued at the next but one meeting.

  • Summary Report of the 521st RSK Meeting

    The RSK was informed about the respective state of consultations in the working groups on aircraft crash, remote inspection, decommissioning licensing and fuel cladding corrosion. The RSK Committee on Pressure-Retaining Components and Materials (DKW) reported on research results related to SG tubes. The FORATOM "European Guideline on the Use of High-Quality Industrial Grade Items in Nuclear Installations" was discussed with regard to necessary consultations within the RSK.

  • Kurzbericht von der 522. RSK-Sitzung

    Die RSK wurde über die Beratungen zum ME 17/037 „Anzeigen bei Wirbelstromprüfung von Dampferzeugerheizrohren“ in GKN II und ME 20/002 (F) „Überschreitung des Jahresgenehmigungswertes für die Ableitung des Nuklids 14C“ im FRM-II im RSK-Ausschuss REAKTORBETRIEB (RB) informiert. Die zusammenfassende Stellungnahme der RSK zu zivilisatorisch bedingten Einwirkungen, Flugzeugabsturz, wurde beraten. Die Beratung wird in der übernächsten Sitzung fortgesetzt.

  • Kurzbericht von der 521. RSK-Sitzung

    Die RSK wurde über den jeweiligen Beratungsstand in den Arbeitsgruppen Flugzeugabsturz, Ferninspektion, Stilllegungsgenehmigung und Hüllrohrkorrosion informiert. Vom RSK-Ausschuss Druckführende Komponenten und Werkstoffe (DKW) wurde über Forschungsergebnisse mit Bezug zu DE-Heizrohren berichtet. Der FORATOM „European Guideline on the Use of High-Quality Industrial Grade Items in Nuclear Installations" wurde im Hinblick auf eine notwendige Beratung in der RSK diskutiert.

  • Summary Report of the 515th RSK Meeting

    This meeting was held as a web conference due to the impact of the Corona pandemic. In the meantime, the RSK had discussed the impacts of the pandemic on the operation and planned overall maintenance inspections of the nuclear power plants among the CORONA ad-hoc working group. The RSK discussed and adopted the statement "Statement on pending safety issues with regard to fuel assembly deformation in German pressurised water reactors (PWRs)".

  • Kurzbericht von der 515. RSK-Sitzung

    Diese Sitzung fand aufgrund der Auswirkungen der Corona-Pandemie als Webkonferenz statt. Die RSK hatte zwischenzeitlich in der Ad-hoc AG CORONA die Auswirkungen der Pandemie auf den Betrieb und die geplanten Revisionen der Kernkraftwerke beraten. Die RSK beriet und verabschiedete die Stellungnahme "Stellungnahme zu noch offenen sicherheitstechnischen Fragen im Hinblick auf Verformungen von Brennelementen in deen Druckwasserreaktoren (DWR)".

  • Kurzbericht von der 516. RSK-Sitzung

    Die RSK wurde u. a. zu folgenden Themen informiert:

    Kernbeladungen und Inspektionen in den noch in Betrieb befindlichen Anlagen
    Netzstabilitäten und Rückwirkungen auf die Kernkraftwerke
    Wirbelstrombefunde an BE-Steuerelementen
    Dampferzeugerheizrohrbefunde in GKN-II
    Leistungsexkursionen bei Steuerstabtests vor dem Wiederanfahren der südkoreanischen Anlage Hanbit-1