Skip to main content
Home

Site name en

 

 

REACTOR SAFETY COMMISSION

Hauptnavigation

  • The RSK
    • Members and Committees
    • Statutes
  • Our Work
    • Consultation Results
    • Agendas
    • Summary Reports
    • International Cooperation
    • Links
  • Secretariat
  • Englisch Englisch
  • Deutsch Deutsch
  • Summary Report of the 521st RSK Meeting

    • Read more about Summary Report of the 521st RSK Meeting

    The RSK was informed about the respective state of consultations in the working groups on aircraft crash, remote inspection, decommissioning licensing and fuel cladding corrosion. The RSK Committee on Pressure-Retaining Components and Materials (DKW) reported on research results related to SG tubes. The FORATOM "European Guideline on the Use of High-Quality Industrial Grade Items in Nuclear Installations" was discussed with regard to necessary consultations within the RSK.

  • Summary Report of the 522nd RSK Meeting

    • Read more about Summary Report of the 522nd RSK Meeting

    The RSK was informed about the consultations on reportable event ME 17/037 “Indications during eddy current testing of steam generator heating tubes” in GKN II and reportable event ME 20/002 (F) “Annual licenced value for the discharge of the nuclide C-14 exceeded” at the FRM-II research reactor in the RSK Committee on REACTOR OPERATION (RB). The RSK's summary statement on man-made hazards, aircraft crash, was discussed. The consultations will be continued at the next but one meeting.

  • Assessment of the coverage of extreme weather conditions by the existing design

    • Read more about Assessment of the coverage of extreme weather conditions by the existing design
  • Einschätzung der Abdeckung extremer Wetterbedingungen durch die bestehende Auslegung

    • Read more about Einschätzung der Abdeckung extremer Wetterbedingungen durch die bestehende Auslegung
  • Ein- oder zweiphasiger Ausfall des Haupt-, Reserve- oder Notstromnetzanschlusses

    • Read more about Ein- oder zweiphasiger Ausfall des Haupt-, Reserve- oder Notstromnetzanschlusses
  • Guideline for the performance of integrated event analyses ("Root Cause Analysis")

    • Read more about Guideline for the performance of integrated event analyses ("Root Cause Analysis")
  • Leitfaden für die Durchführung von ganzheitlichen Ereignisanalysen

    • Read more about Leitfaden für die Durchführung von ganzheitlichen Ereignisanalysen
  • Formation and effects of an unborated water plug during steam generator tube rupture

    • Read more about Formation and effects of an unborated water plug during steam generator tube rupture
  • Ausbildung und Auswirkungen eines Deionatpfropfens beim Dampferzeugerheizrohrleck

    • Read more about Ausbildung und Auswirkungen eines Deionatpfropfens beim Dampferzeugerheizrohrleck
  • Faults in one or two phases of the main, standby or emergency grid connection

    • Read more about Faults in one or two phases of the main, standby or emergency grid connection

Pagination

  • Previous page ‹‹
  • Page 41
  • Next page ››

Fußzeilenmenü

  • Legal notice
  • Privacy policy

Copyright · All rights reserved