06.11.2013 Assessment of the coverage of extreme weather conditions by the existing design
29.08.2013 RSK’s understanding of safety philosophy (published in the Federal Gazette, Official Section, on 05.12.2013, B4)
20.06.2013 Specification of requirements related to the 10-hours autarky in the event of external human-induced hazards (emergency conditions)
11.04.2013 (available in German only) Minimum value of 0.1g (approx. 1.0 m/s²) for the maximum horizontal ground acceleration in an earthquake
11.04.2013 PWR neutron flux oscillations
21.02.2013 (available in German only) Pressure and leak tests of components of the reactor coolant pressure boundary and outer systems, especially after repairs
17.01.2013 (available in German only) Detection of flaws in the reactor pressure vessel of Unit 3 of Belgium's Doel nuclear power plant (Doel-3)
13.12.2012 (available in German only) Criteria for alerting the disaster control authority by the operators of nuclear facilities

Note:

Joint RECOMMENDATION of the RSK and the SSK (available in German only)

13.12.2012 (available in German only) Grid stability: Impact of stability problems in the German power grid on electrical and I&C installations of nuclear power plants and securing the required electrical power supply for these plants from the grid
01.12.2012 Testing and monitoring programme for oil-paper insulated transformers and dry transformers in German nuclear power plants

Note:

REPORT of the RSK-Committee on ELECTRIC INSTALLATIONS (EE)

26.09.2012 (available in German only) Operating documents: “Requirements and conditions of safe operation"
26.09.2012 Recommendations of the RSK on the robustness of the German nuclear power plants
26.09.2012 (available in German only) Redesign of I&C modules and components in nuclear power plants
12.07.2012 (available in German only) Potential threat to nuclear safety by loss of know-how and motivation
03.05.2012 (available in German only) Application of the operating manual during operation of German nuclear power plants (Published in the Federal Gazette (AT) on 30 July 2012, B1)
03.05.2012 (available in German only) Plant-specific safety review (RSK-SÜ) of German research reactors in the light of the events in Fukushima-I (Japan)
03.05.2012 (available in German only) Leakages from steam generator (SG) tubes to be postulated: multiple tube rupture/leak opening of wall thickness-reduced SG tubes (Published in the Federal Gazette (AT) on 26 July 2012, B3)
05.04.2012 Recommendations on the maximum permissible critical boron concentration to ensure subcriticality after operation in"reflux condenser mode“ during a small-break loss-of-coolant accident
05.04.2012 Stress analysis and testability of the weld at the joint between the cylinder and lower bottom head in reactor pressure vessels (RPVs) of nuclear power plants with boiling water reactors of the BWR 69 type nuclear power plants Krümmel (KKK), Brunsbüttel (KKB), Philippsburg Unit 1 (KKP-1) and Isar Unit 1 (KKI-1)
05.04.2012 Loss of the primary ultimate heat sink (Published in the Federal Gazette (AT) on 03 August 2012, B5)