28.04.2005 |
(available in German only) |
BMU project SR 2392"Use of thermoelements for measuring the temperature of pipe walls in nuclear power plants within the framework of the fatigue analysis"and consideration of the medium influence in fatigue analyses according to the KTA safety standards |
24.02.2005 |
(available in German only) |
Safety-related aspects of conceptual questions on the final disposal of irradiated fuel elements using canisters emplaced in bore holes |
27.01.2005 |
|
Safety aspects of the use of high burn-up fuel elements under reactivity accident conditions |
27.01.2005 |
(available in German only) |
Project SR 2318 of the BMU"Assessment of the informational value of ultra-sonic and eddy-current examinations of austenitic RPV cladding |
27.01.2005 |
(available in German only) |
Gases in a repository |
16.12.2004 |
(available in German only) |
Expansion of the Gronau uranium enrichment facility |
16.12.2004 |
(available in German only) |
Reportable event"Fuel assembly drop during loading of a transport cask"at Biblis NPP, Unit 1, on 06.08.2001 |
22.07.2004 |
|
Management of ageing processes at nuclear power plants |
22.07.2004 |
|
Requirements for the demonstration of effective emergency core cooling during loss-of-coolant accidents involving the release of insulation material and other substances |
27.05.2004 |
|
KTA Safety Standard 2201.1:"Design of Nuclear Power Plants against Seismic Events; Part 1: Principles"; as amended in 6/90 - Recommendations for the review of the safety standard |
04.03.2004 |
|
Incident at the Davis Besse nuclear power plant (USA) rated at INES Level 3 of 6 March 2002,"Boric Acid Corrosion on the Reactor Vessel Head"and lessons learned for German plants |
11.12.2003 |
(available in German only) |
Improper fuel handling at the Gemeinschaftskernkraftwerk Neckar (GKN) nuclear power plant during repositioning of a fuel element (Unit 1, Reportable Event 03/2002) and a primary neutron source (Unit II, Reportable Event 02/2002) |
13.11.2003 |
(available in German only) |
Reportable event at the Kernkraftwerk Unterweser (KKU) nuclear power plant: Unavailability of one of four main steam safety and relief valves when demanded on 06.06.1998 |
16.10.2003 |
(available in German only) |
Criteria for alerting civil protection authorities through operators of nuclear facilities, September/October 2003
Note: Joint RECOMMENDATION of the RSK and the SSK |
16.10.2003 |
(available in German only) |
Control elements damages at BWR plants |
18.09.2003 |
|
Increase of the thermal reactor power of the Grafenrheinfeld nuclear power plant (KKG) |
10.07.2003 |
(available in German only) |
Kernkraftwerk Unterweser (KKU) nuclear power plant - Reportable event: Indications at nozzles connecting the feedwater systems to the steam generators |
10.07.2003 |
|
General requirements on the measures for the prevention of impermissible radiolysis gas reactions |
10.04.2003 |
(available in German only) |
Gemeinschaftskernkraftwerk Neckarwestheim nuclear power plant, Unit 2 (GKN-2) - Rupture of a thermosleeve in RHR line JNA 31 |
10.04.2003 |
(available in German only) |
Implementation of the RSK recommendation "Safety guidelines for dry interim storage of irradiated fuel assemblies in storage casks" in the BfS draft licence for the on-site interim storage facility in Gemmrigheim of the Gemeinschaftskernkraftwerk Neckar GmbH (ZL-GKN) |