Criteria for alerting civil protection authorities through operators of nuclear facilities, September/October 2003 Read more about Criteria for alerting civil protection authorities through operators of nuclear facilities, September/October 2003
Kriterien für die Alarmierung der Katastrophenschutzbehörde durch die Betreiber kerntechnischer Einrichtungen Read more about Kriterien für die Alarmierung der Katastrophenschutzbehörde durch die Betreiber kerntechnischer Einrichtungen
Reportable event at the Kernkraftwerk Unterweser (KKU) nuclear power plant: Unavailability of one of four main steam safety and relief valves when demanded on 06.06.1998 Read more about Reportable event at the Kernkraftwerk Unterweser (KKU) nuclear power plant: Unavailability of one of four main steam safety and relief valves when demanded on 06.06.1998
Meldepflichtiges Ereignis im Kernkraftwerk Unterweser (KKU) Nichtverfügbarkeit einer von vier Frischdampf-Sicherheitsarmaturen-Stationen (FSA) bei Anforderung am 06.06.1998 Read more about Meldepflichtiges Ereignis im Kernkraftwerk Unterweser (KKU) Nichtverfügbarkeit einer von vier Frischdampf-Sicherheitsarmaturen-Stationen (FSA) bei Anforderung am 06.06.1998
Improper fuel handling at the Gemeinschaftskernkraftwerk Neckar (GKN) nuclear power plant during repositioning of a fuel element (Unit 1, Reportable Event 03/2002) and a primary neutron source (Unit II, Reportable Event 02/2002) Read more about Improper fuel handling at the Gemeinschaftskernkraftwerk Neckar (GKN) nuclear power plant during repositioning of a fuel element (Unit 1, Reportable Event 03/2002) and a primary neutron source (Unit II, Reportable Event 02/2002)
Implementation of the RSK recommendation "Safety guidelines for dry interim storage of irradiated fuel assemblies in storage casks" in the BfS draft licence for the Lingen on-site interim storage facility Read more about Implementation of the RSK recommendation "Safety guidelines for dry interim storage of irradiated fuel assemblies in storage casks" in the BfS draft licence for the Lingen on-site interim storage facility
BMU-Fragen zur Fortschreibung der Endlager-Sicherheitskriterien Read more about BMU-Fragen zur Fortschreibung der Endlager-Sicherheitskriterien
Conclusions drawn from a plant-specific probabilistic safety analysis of low-power and shutdown operation for light water reactors Read more about Conclusions drawn from a plant-specific probabilistic safety analysis of low-power and shutdown operation for light water reactors
Folgerungen aus einer anlagenspezifischen probabilistischen Sicherheitsanalyse für den Nicht-Leistungsbetrieb bei Leichtwasserreaktoren Read more about Folgerungen aus einer anlagenspezifischen probabilistischen Sicherheitsanalyse für den Nicht-Leistungsbetrieb bei Leichtwasserreaktoren