Summary Report of the 482nd RSK Meeting
16.03.2016

The 482nd RSK meeting was held in Berlin. The RSK was informed about the current status of consultations on the Belgian plants Doel-3 and Tihange-2 in the Committee on PRESSURE-RETAINING COMPONENTS AND MATERIALS (DKW) as well as on the consultations on the topic of lightning with parameters above the standard lightning current parameters of the Committee on ELECTRIC INSTALLATIONS (EE). The main topics of consultations of the four RSK committees were presented. The RSK started consultations on the statement on damage to fuel assembly alignment pins and core components ("Schäden an Brennelement-Zentrierstiften und Kernbauteilen").