26.06.2014 |
|
Faults in one or two phases of the main, standby or emergency grid connection |
22.05.2014 |
|
The RSK guideline for the performance of integrated event analyses in comparison with the VGB Guideline on the Integrated Event Analysis |
06.11.2013 |
|
Assessment of the coverage of extreme weather conditions by the existing design |
29.08.2013 |
|
RSK’s understanding of safety philosophy (published in the Federal Gazette, Official Section, on 05.12.2013, B4) |
20.06.2013 |
|
Specification of requirements related to the 10-hours autarky in the event of external human-induced hazards (emergency conditions) |
11.04.2013 |
(available in German only) |
Minimum value of 0.1g (approx. 1.0 m/s²) for the maximum horizontal ground acceleration in an earthquake |
11.04.2013 |
|
PWR neutron flux oscillations |
21.02.2013 |
(available in German only) |
Pressure and leak tests of components of the reactor coolant pressure boundary and outer systems, especially after repairs |
17.01.2013 |
(available in German only) |
Detection of flaws in the reactor pressure vessel of Unit 3 of Belgium's Doel nuclear power plant (Doel-3) |
13.12.2012 |
(available in German only) |
Criteria for alerting the disaster control authority by the operators of nuclear facilities
Note: Joint RECOMMENDATION of the RSK and the SSK (available in German only) |
13.12.2012 |
(available in German only) |
Grid stability: Impact of stability problems in the German power grid on electrical and I&C installations of nuclear power plants and securing the required electrical power supply for these plants from the grid |
01.12.2012 |
|
Testing and monitoring programme for oil-paper insulated transformers and dry transformers in German nuclear power plants
Note: REPORT of the RSK-Committee on ELECTRIC INSTALLATIONS (EE) |
26.09.2012 |
(available in German only) |
Operating documents: “Requirements and conditions of safe operation" |
26.09.2012 |
|
Recommendations of the RSK on the robustness of the German nuclear power plants |
26.09.2012 |
|
Redesign of I&C modules and components in nuclear power plants |
12.07.2012 |
(available in German only) |
Potential threat to nuclear safety by loss of know-how and motivation |
03.05.2012 |
(available in German only) |
Application of the operating manual during operation of German nuclear power plants (Published in the Federal Gazette (AT) on 30 July 2012, B1) |
03.05.2012 |
(available in German only) |
Plant-specific safety review (RSK-SÜ) of German research reactors in the light of the events in Fukushima-I (Japan) |
03.05.2012 |
(available in German only) |
Leakages from steam generator (SG) tubes to be postulated: multiple tube rupture/leak opening of wall thickness-reduced SG tubes (Published in the Federal Gazette (AT) on 26 July 2012, B3) |
05.04.2012 |
|
Recommendations on the maximum permissible critical boron concentration to ensure subcriticality after operation in"reflux condenser mode“ during a small-break loss-of-coolant accident |